top of page

Consolidating services and cutting costs without compromising design, teaching mission, or patient experience.

UC System-mandated seismic upgrading and high rents near campus required UC Davis to look for innovative solutions for their ambulatory care services. The desired solution would include right-sizing clinical departments, strategic colocation of services, and maximizing flexibility for future use without compromising their teaching mission or patient care.


Working closely with the UC Davis Clinical Strategy Group to operationalize current practices and minimize non-clinical function in the clinical setting, NBBJ created a plan to consolidate all clinical services into the main Ambulatory Care Center on the Sacramento Campus - without compromising their teaching mission. By improving exam room utilization, specifying new paradigms in faculty officing, and designing universal exam modules, the 12-year plan consolidates three buildings into one.


The preferred option saves approximately $150M in construction and occupancy costs by consolidating services, improving room utilization by 25% (not to exceed 65%) for all service lines within universally designed clinic modules.

LOCATION

Sacramento, CA, USA

WITH

SCALE

Large

YEAR

2018

 

*These categories list the skills and technology that I personally contributed to these projects. 

PRACTICE CATEGORIES

PROJECT ROLE

SCOPE ELEMENTS

SKILLS*

TECHNOLOGY*

Go!

 

 

PROJECT GALLERY

 

 

PROJECT SLIDESHOW

See below for a slideshow of images from this project. Click the image to expand.

bottom of page